Review main Merged

62337[BUGFIX] Start nighly test run at 3am rather than 0:03am

Anja Leichsenring CR +2 V +2 Easy +1 −1 updated 11/18/19, 13:10

Commit message

The test runs need to finish one after another, the master
currently overlaps with the 9.5, causing unneccessary load
on the build machines.

Review

  • Code review CR +2 Done
    • Andreas Kienast +2
  • Verified V +2 Done
    • Andreas Kienast +2

Issues 2

Files 1

Review log 48

  1. Anja Leichsenring uploaded patch set 1 11/18/19, 08:06

  2. TYPO3com voted on patch set 1 V -1 11/18/19, 08:16 Completed build in 09m 24s on Mon, 18 Nov, 08:16 AM Test Summary: 27599 passed Find logs and detail information at https://bamboo.typo3.com/browse/CORE-GTC-38443

  3. TYPO3com commented on patch set 1 11/18/19, 08:34 Completed build in 36m 48s on Mon, 18 Nov, 08:34 AM Test Summary: 48114 passed Find logs and detail information at https://bamboo.typo3.com/browse/CORE-GTC-38443

  4. TYPO3com voted on patch set 1 V +1 11/18/19, 09:08 Completed build in 1h 38m 23s on Mon, 18 Nov, 09:08 AM Test Summary: 48344 passed Find logs and detail information at https://bamboo.typo3.com/browse/CORE-GTC-38443

  5. Anja Leichsenring updated the commit message in patch set 2 11/18/19, 12:59

  6. Andreas Kienast voted on patch set 2 V +2 CR +2 11/18/19, 12:59

  7. Andreas Kienast merged patch set 3 11/18/19, 12:59

  8. TYPO3com voted on patch set 2 V +1 11/18/19, 13:10 Completed build in 10m 45s on Mon, 18 Nov, 01:10 PM Test Summary: 48344 passed Find logs and detail information at https://bamboo.typo3.com/browse/CORE-GTC-38448