Review 9.5 Merged

62555[TASK] Restructure nightly plans in stages a 50 jobs

Anja Leichsenring CR +2 V +2 Normal +61 −80 updated 12/06/19, 11:45

Commit message

The rearranged stages structure will prevent the host
machines and also gerrit from being overwhelmed with a
high amount of running jobs all at once.
Instead, the equal size of each stage keeps the load
on an average height, but it will increase the total
runtime of a plan. We prefer stability over quick runs
in nightlies.

Review

  • Code review CR +2 Done
    • Anja Leichsenring +2
  • Verified V +2 Done
    • Anja Leichsenring +2
    • TYPO3com +1 CI

Issues 1

Files 1

Review log 46

  1. Anja Leichsenring uploaded patch set 1 12/06/19, 11:10

  2. Anja Leichsenring uploaded patch set 2 12/06/19, 11:20

  3. TYPO3com voted on patch set 1 V -1 12/06/19, 11:35 Completed build in 24m 03s on Fri, 6 Dec, 11:35 AM Test Summary: 71491 passed Find logs and detail information at https://bamboo.typo3.com/browse/CORE-GTC95-1674

  4. TYPO3com voted on patch set 2 V +1 12/06/19, 11:43 Completed build in 17m 03s on Fri, 6 Dec, 11:43 AM Test Summary: 71802 passed Find logs and detail information at https://bamboo.typo3.com/browse/CORE-GTC95-1675

  5. Anja Leichsenring voted on patch set 2 V +2 CR +2 12/06/19, 11:45

  6. Anja Leichsenring merged patch set 3 12/06/19, 11:45