Review TYPO3_8-7 Merged

62636[TASK] Restructure nightly plans in stages a 50 jobs

Anja Leichsenring CR +2 V +2 Normal +39 −33 updated 12/14/19, 12:06

Commit message

The rearranged stages structure will prevent the host
machines and also gerrit from being overwhelmed with a
high amount of running jobs all at once.
Instead, the equal size of each stage keeps the load
on an average height, but it will increase the total
runtime of a plan. We prefer stability over quick runs
in nightlies.

Review

  • Code review CR +2 Done
    • Anja Leichsenring +2
  • Verified V +2 Done
    • Anja Leichsenring +2
    • TYPO3com +1 CI

Issues 1

Files 1

Review log 46

  1. Anja Leichsenring uploaded patch set 1 12/14/19, 11:52

  2. Anja Leichsenring uploaded patch set 2 12/14/19, 11:52

  3. TYPO3com voted on patch set 1 V +1 12/14/19, 12:02 Completed build in 09m 38s on Sat, 14 Dec, 12:02 PM Test Summary: 80410 passed Find logs and detail information at https://bamboo.typo3.com/browse/CORE-GTC87-3773

  4. TYPO3com voted on patch set 2 V +1 12/14/19, 12:06 Completed build in 10m 33s on Sat, 14 Dec, 12:06 PM Test Summary: 80410 passed Find logs and detail information at https://bamboo.typo3.com/browse/CORE-GTC87-3774

  5. Anja Leichsenring voted on patch set 2 V +2 CR +2 12/14/19, 12:06

  6. Anja Leichsenring merged patch set 3 12/14/19, 12:06