Issue Bug Under Review

#111647Scheduler loses track of running executions of parallel tasks

Amir Arends 11/28/26, 07:48 updated 11/28/26, 09:23

Description

For tasks that allow parallel execution, the scheduler keeps a list of the currently running executions. A new execution can reuse the id of one that is still running, as soon as an earlier execution has finished before it. The entry of the still running execution is then overwritten.

Steps to reproduce:
1. Allow parallel execution for a task.
2. Start execution A, then execution B.
3. Let A finish, then start execution C.
4. Let B finish.

Expected: the task is still shown as running, as C has not finished.
Actual: the task is shown as not running, and C is no longer tracked.

Reviews 1

History 02

  1. Gerrit Code Review pushed patch set 1 for main to change 98136 status New Under Review 11/28/26, 07:50

  2. Gerrit Code Review pushed patch set 2 for main to change 98136 11/28/26, 09:23